How Long Does a Kitchen Renovation Take?

kitchen renovation

A kitchen renovation is an exciting transformation that enhances both functionality and aesthetics, but it requires careful planning to avoid delays. Whether you’re making small upgrades or completely overhauling your space, understanding the timeline ensures a smoother process with fewer disruptions. In Singapore, a kitchen renovation typically takes between 4 to 12 weeks, depending on factors like project complexity, contractor availability, and material sourcing.

To help you stay on track, this guide breaks down each stage of the renovation process—from initial planning to final completion—so you can set realistic expectations and achieve your dream kitchen efficiently.

Phase 1: Planning & Design (2 – 4 Weeks)

The first step in any kitchen renovation is careful planning. Rushing this phase can lead to costly mistakes, delays, and design regrets.

What Happens in This Phase?

  • Researching kitchen renovation contractors and obtaining quotes.
  • Setting a realistic budget and prioritizing key upgrades.
  • Selecting materials, appliances, and design layouts.
  • Securing permits (if necessary, for HDB or condo renovations).

How to Keep It on Track:

✔ Have a clear vision and mood board before approaching contractors.
✔ Get at least three contractor quotes to compare pricing and timelines.
✔ Finalize all material choices upfront to avoid last-minute sourcing delays.

Understanding how to choose the right kitchen renovation contractor can help ensure you hire a reliable professional who meets your budget and timeline.

Phase 2: Demolition & Site Preparation (1 – 2 Weeks)

Before the new kitchen renovation takes shape, the old one has to go. This phase involves removing existing cabinets, countertops, flooring, and appliances. For major renovations, structural work like knocking down walls may be required. Proper site preparation ensures a smooth transition to the installation phase, preventing unexpected delays.

What Happens in This Phase?

  • Removing old kitchen elements (cabinets, countertops, backsplash, flooring).
  • Disconnecting plumbing and electrical connections.
  • Clearing out debris and preparing the site for new installations.
  • Checking for structural reinforcements if walls are being removed.

How to Keep It on Track:

✔ Ensure that your contractor arranges for debris disposal.
✔ Plan an alternative cooking setup since your kitchen will be unusable.
✔ If you live in an HDB or condo, confirm renovation noise regulations to avoid work stoppages.
✔ Discuss any hidden issues (like plumbing leaks or wiring problems) before moving to the next phase.

Phase 3: Structural & Masonry Work (1 – 3 Weeks)

This stage is crucial for layout modifications. If your kitchen renovation includes tiling, plumbing relocation, or wall restructuring, it will add time to the project. Proper coordination with contractors can help prevent unnecessary delays.

What Happens in This Phase?

  • Constructing new partition walls (if layout changes are involved).
  • Plumbing and electrical rough-ins (installing pipes and wiring before cabinets go in).
  • Floor and wall tiling (if part of the renovation plan).

How to Keep It on Track:

✔ Finalize all layout decisions before demolition starts.
✔ Use pre-made kitchen cabinets to reduce carpentry wait time.
✔ Ensure contractors schedule plumbers and electricians in advance.

Understanding budgeting for a kitchen renovation can help you allocate funds wisely and prevent unexpected expenses during the renovation process.

Phase 4: Carpentry & Cabinet Installation (2 – 4 Weeks)

This is one of the longest phases, as kitchen cabinetry is often custom-built to fit your space. Delays usually occur due to material sourcing, last-minute design modifications, or contractor scheduling conflicts.

What Happens in This Phase?

  • Fabrication of cabinets, countertops, and storage units.
  • Installation of new cabinetry and shelving.
  • Adjustments for plumbing and electrical points.

How to Keep It on Track:
✔ Choose a contractor that pre-fabricates cabinets off-site to speed up installation.
✔ Confirm countertop measurements in advance to prevent misalignment issues.
✔ If using imported materials, order them early to avoid supply chain delays.

Exploring must-have features in a kitchen renovation can help you maximise space and improve functionality, especially in compact layouts.

Phase 5: Countertops, Backsplash & Flooring (1 – 2 Weeks)

Once the cabinetry is in place, it’s time to install countertops, backsplash tiles, and flooring. This phase enhances both functionality and aesthetics, bringing the kitchen closer to completion. The timeline for this step depends on the material type—quartz and granite countertops require more processing than laminate options, while intricate tilework may extend installation time.

What Happens in This Phase?

  • Measuring and fitting countertops.
  • Installing backsplash tiles or panels.
  • Laying and sealing flooring.
  • Final surface treatments for durability and easy maintenance.

How to Keep It on Track:
✔ Choose readily available materials to avoid delays in fabrication.
✔ Allow proper drying time for floor tiles and adhesive to prevent cracking.
✔ Inspect tile work before grouting to catch any alignment issues early.
✔ Schedule countertop installation after the cabinetry is fully secured to ensure precise measurements.

Phase 6: Appliance & Fixture Installation (1 Week)

This stage involves bringing in all the functional elements that complete your kitchen renovation, ensuring everything is properly connected and operational.

What Happens in This Phase?

  • Connecting water and gas pipes.
  • Installing sinks, faucets, and light fixtures.
  • Placing and securing appliances (stove, oven, refrigerator, dishwasher).
  • Testing electrical and plumbing connections to ensure functionality.

How to Keep It on Track:
✔ Have all appliances delivered before installation begins.
✔ Check for proper electrical voltage and compatibility with your kitchen layout.
✔ Confirm gas and water connections are leak-free before finalizing installation.

Phase 7: Final Touches & Cleanup (1 Week)

Your kitchen is almost complete! This final stage includes finishing touches like painting, hardware installation, and a deep cleaning before you can start using your newly renovated space.

What Happens in This Phase?

  • Installing cabinet handles, drawer pulls, and accessories.
  • Final quality inspection and adjustments.
  • Cleaning up dust and debris.
  • Ensuring all fixtures and appliances function correctly.

How to Keep It on Track:
✔ Conduct a final walkthrough with your contractor.
✔ Test all appliances, water flow, and electrical outlets for proper functionality.
✔ Address any minor touch-ups or fixes before signing off on the project.

Conclusion

A well-planned kitchen renovation typically takes 4 to 12 weeks, depending on the scope of work and contractor efficiency. Minor upgrades (like replacing countertops and cabinets) can be done in a month, while full-scale renovations involving demolition, new plumbing, and custom carpentry take longer.

To avoid delays, homeowners should finalize design choices early, order materials in advance, and work with a reputable contractor. Knowing the renovation timeline helps you manage expectations and plan your daily routine while construction is underway.

Karen Sy

Karen Sy has been writing for more than a decade. She's a former journalist turned lifestyle writer, then a music writer. She now works as a freelance copywriter, blogger, and graphic artist. Karen loves to travel, attend music concerts and read. She now contributes to The Singaporean and shares the best of what the country has to offer.